![]() |
|
CALSIM II Model Studies for SWP Delivery Capability Report (May 17th, 2002) |
|
Three Calsim II model studies have been completed to evaluate State Water Project delivery capability at two levels of development. One at 2001 level of use and two at projected 2021 level of use. The demand of the SWP contractors is at its current level for 2001 Study. For the 2021A Study SWP contractors demand is assumed to be varying each year, depending on the weather conditions at the 2021 level of use. For the 2021B Study the SWP demand is maximized each year up to Table A, regardless of weather.
|
| Back | Home | Available Studies | Computer Models | Reports | Section Home Pages |
Site Map | ||
| Hydrology
& Operations |
Delta Modeling | Computer Assistance | |||||
Disclaimer URL http://modeling.water.ca.gov/hydro/studies/calfed/index.html Copyright © 2000. |